Evaluation path

Book a demo

Use a scoped Trade walkthrough, not a generic product tour.

The strongest Trade demos are built around actual export review pain: transaction screening, analyst workflow, license drawdown control, and the next-step roadmap for controlled data delivery.

Start with the pain point you need to fix first.
Use the live module pages to scope the walkthrough.
Trade is entered today through the SecurePoint workspace path.

Demo agenda

01Show the transaction queue and analyst review flow
02Walk the evidence and audit record
03Review license lifecycle and drawdown controls
04Discuss rollout scope and planned controlled-data workflow

Direct answer

How do you start a SecurePoint Trade evaluation?

In the current repo, the safe and honest path is to use the SecurePoint sign-in flow and scope the walkthrough around the public module pages first. There is no separate public lead-capture backend implemented inside Trade today, so this page focuses on a clear evaluation path rather than pretending there is a live form or scheduler in the repo.

  • Use public pages to align scope first
  • Move into SecurePoint sign in for workspace access
  • Keep planned workflows labeled as planned during the walkthrough

What to cover

A serious buyer demo should answer operational questions fast.

The best walkthrough is not feature bingo. It is proof that Trade can support the actual compliance operating model the buyer is trying to stabilize.

If the pain is transaction review

Focus on Trade Core, analyst workflow, approvals, evidence generation, and audit posture.

If the pain is license tracking

Focus on the license workspace, drawdown workflow, threshold alerts, and shipment-to-license linkage.

If the pain is rollout complexity

Focus on API keys, connectors, Oracle EBS mapping posture, intake methods, and implementation scope.

If the pain is controlled technical data release

Use the planned Controlled Data Delivery page to shape the roadmap conversation without overclaiming what is live today.

Next step

Use the public pages to align scope, then enter the Trade workspace.

This keeps the evaluation grounded in what ships today, what is optional, and what is still planned.